ElmoBlue Big House Tour Part 3: Outside Walls

GoBlueWolverine subscriber "ElmoBlue" is in the construction business, and so recently got an extensive 'cook's tour' of The Big House construction - which he is sharing with us. *Part Three* - the outside walls. To get to the point of erecting the steel, large portions of the east side of the stadium had to be excavated.

ElmoBlue: Here are photos of the around the walls from the outside. To get to the point of erecting the steel, large portions of the east side of the stadium had to be excavated to help with the upgrading of the infrastructure, including having to dispose of the 'cut' because of issues with the soil.  As noted in the construction photos put up by the university, this infrastructure work required the destruction of the visitor's locker room, but ahopefully make out in the last photo of this group, the visitor locker room has at least progressed to having some walls now.  


south side looking at Crisler


looking across Stadium Blvd at golf course.


southeast side looking at Crisler


north side


looking down into visitors lockerroom



The Michigan Insider Top Stories