Board Work

Work on scoreboards at West Virginia's two major sports venues is moving ahead

Scoreboards at both the Coliseum and Puskar Stadium are coming down in preparation for the installation of new LED fully-configurable screens. Also at the Coliseum, the floor is being stripped. Once the new scoreboards are installed, a newly designed surface will be installed.




Parts of the new board await installation



Removal of the old scoreboard on the south end of the stadium has left just the steel support posts awaiting the new LED big screen



The view from outside the stadium



The scoreboard at center court is down to its framework



Floor stripping


All photos copyright BlueGoldNews.com


BlueGoldNews Top Stories